RFP-2053548-UPCOMING TENDER

RFP-2053548

Title:   Services for RA-ZU / UN-LF Chemical EOR Pilot Project Implementation

 

Date of Announcement

:

14th July 2019

Last Date for Submission of applications for participation in tender  

:

22nd July 2019

Tentative Date of Issue of Tender

:

1st August 2019

 

  • BRIEF SCOPE OF SERVICES – PART I AND PART II

 

  • PART I:          SCOPE OF SERVICES AND PROJECT BRIEF FOR RA-ZU CHEMICAL EOR PILOT PROJECT IMPLEMENTATION

 

 

Kuwait Oil Company (KOC / Company) is intends to implement Enhanced Oil Recovery (EOR) technologies at a countrywide level, whenever it is a technically and commercially viable. Potential reservoir candidates were studied in detail and suitable EOR technologies were identified for each of these reservoirs. For one of the reservoirs, Raudhatain-Zubair (RA-ZU), alkali-surfactant-polymer (ASP) is identified as the most suitable EOR method. Laboratory experiments were conducted on outcrop Bentheimer and RA-ZU core plugs and were flooded with most suitable chemicals for enhanced oil recovery and the recorded results are promising. Following the success of the experiments in the laboratory, the efficacy of the ASP formulation was further demonstrated via implementation of a successful Single Well Chemical Tracer (SWCT) Test in the field. Now the Company is intending to conduct a multi-well EOR pilot to confirm previously obtained results in preparation for commercial deployment.

 

Prior to chemical injection, a softened seawater injection phase will be performed to reduce the high in-situ brine salinity and, in particular, the very high divalent ion concentration to manageable levels. This will pre-condition the reservoir and make it amenable to ASP slug and polymer drive injection. The Contractor will carry out a pre-flush injection phase using softened water at a maximum rate of 3000 BWPD over a period of 1-2 years prior to the ASP slug injection. The main criterion to stop the pre-flush water injection phase is to get divalent ion concentration to levels that can be mitigated via use of commercially available scale inhibitors prior to ASP injection.

 

            The scope of the Pilot is to conduct a successful turnkey inverted 5-spot ASP pilot project [four (4) surrounding producers, one (1) central injector well, one (1) logging observation well and one (1) sampling observation well, within an area of approximately 2.1 acres] in RA-ZU in North Kuwait with minimal impact on the existing field operations (see Figure 1). The Contractor with relevant chemical mixing and injection experience shall perform detailed engineering, construction, installation, and operation of a fit-for-purpose plant by the specified target date. This plant can be skid mounted and the successful Contractor shall assemble, install & commission, operate and maintain the plants at the designated location.

 

The duration of the envisioned project is three (3) years. The Company will not recognize incremental costs related to the extension of the pilot duration, if low productivity or observation wells malfunctioning is caused by the inappropriate operational procedures that are within the scope and control of the Contractor.

From lab testing and initial pilot design (notional), the figures and only the selected chemical and formulations shall be implemented for the pilot (all pilot stages), unless further instructed by the Company (refer to ANNEXURE 4).

 

  • The scope of the services (Services) are further described in Appendix IA, and shall include but not limited to the following:

 

  • Upfront tasks: conduct and deliver fit-for-purpose: (1) Detailed engineering and design of the Pilot installations and equipment, (2) Integrated monitoring-surveillance plan with monitoring equipment and (3) Pilot Operating Philosophy. The final location of fit-for-purpose surface facilities defined by the Contractor will be finalized in consultation with KOC upon awarding the contract.

 

  • Deliver the fit-for-purpose water treatment facility (one or several skids) including the required units (filtration, softening, etc.), using the source water provided by KOC. The distance from pilot wells to the water supply source is approximately 1100 m. The Contractor can select fit-for-purpose designs while providing the associated cost breakdown ensuring softened seawater specifications are met.
  •  
  • Procure and Deliver the selected chemicals (according to their specifications) in the assigned chemical storage warehouse. The Chemical warehouse dedicated to the EOR pilot, with Temperature and Humidity requirements and environmental condition, must be as per the chemical Manufacturer's instruction and is in the scope of the Contractor
  •  
  • Ensure all operations are carried out as per KOC standards or international industry standards such as API, the International Oil & Gas Producers (IOGP) or equivalent standards.

 

  • Decommissioning of Pilot facilities and site remediation, as required.

 

  • Deliver the fit-for-purpose chemical storage facility at the pilot location.
  •  
  • Deliver the fit-for-purpose new or used chemical mixing/injection and water treatment facilities, with an operational life of 5 years, in compliance with KOC or international industry standards such as API, the International Oil & Gas Producers (IOGP) or equivalent standards. The pilot fit-for-purpose facilities shall be used to perform the mixing of ASP chemicals and chemical additives (biocide, oxygen scavenger, etc.) in the proper order. The recommended strategy / procedure for blending the chemicals should be case-specific.

 

On the Pilot Injection side, the Contractor's piping scope includes connecting the seawater source from the above-mentioned RA-0171 tie-in point with the softening system beyond which the Contract shall route softened water and pilot injectants as per the recommended injection sequence towards the central pilot injector.

 

  • Provide fit-for-purpose lab facilities and adequate online meters and sampling points along the chemical processing to quality check all the EOR fluids, on a continuous basis before injection. Quality controlling the pilot chemicals will be done by the Contractor. The Company may at its sole decision may instruct to get it verified by an approved third-party the cost of which shall be deemed included in the Contract Price.
  •  
  • The Contractor shall design, perform and interpret results of an Inter Well Tracer Test campaign to evaluate reservoir conformance during the pre-flush phase as well as oil saturation within the pilot area before and after the polymer drive phase. Subsurface logging and well intervention will be covered by the Company as needed.
  •  
  • Procure and deliver adequate low shear pumps to minimize polymer degradation and must be capable of injecting up to 2000 bbls/day into the injector well. The pump feed strategy must be clearly explained. Redundancy plans using especially, but not only, spare pumps to ensure continuous injection operations are required.
  •  
  • Provide adequate fluid flow metering (rate, composition) at each injection wells and at the four producers (multi-phase flow metering) in addition to one 3-phase test separator to cross-check rates and composition of produced fluids for each producer.
  •  
  • Provide an efficient and fit-for-purpose produced fluid handling facilities to separate oil, gas and produced water and to route the produced fluids to GC-25.
  •  
  • The Contractor shall assist in building KOC’s capability with respect to chemical EOR field applications in accordance with KOC’s expectations.
  •  
  • Stages of the Services

 

      • The Services shall include (but not limited) to the following phases:
      •  
  • Phase 1: This phase is design of the fit-for-purpose surface facilities as per Company’s requirement.
  •  
  • Phase 2: Prior to the commencement of the chemical flooding, the Contractor shall submit a detailed plan for injection strategy for the RA-ZU pilot.

 

 

  • Deliverables

 

The deliverables by the Contractor for each phase of the Services are described below and shall be as further detailed in Appendix IA.

 

  • Report on system operation capacity
  •  
  • Report on automation
  •  
  • Report on main equipment components
  •  
  • Surveillance and monitoring plan
  •  
  • List of utility requirements

 

  • ASP flooding implementation 
  •  
  • PART II: SCOPE OF SERVICES AND PROJECT BRIEF FOR UN-LF CHEMICAL EOR PILOT PROJECT IMPLEMENTATION

 

 

            Polymer flooding was identified as the most suitable EOR method For Umm Niqqa Lower Fars (UN-LF). Laboratory experiments were conducted on core plugs taken from UN-LF and were flooded with most suitable chemicals for enhanced oil recovery and the recorded results are promising. Now the Company would like to perform a larger test in the field by conducting a Pilot.

 

            The scope of the services is to conduct a successful turnkey Normal 5-spot polymer flooding pilot [four (4) injectors, one (1) main producer well within an area of approximately 1 (1) acre] in UN-LF in North Kuwait with minimal impact on the existing field operations. The Contractor with relevant chemical mixing and injection experience shall due diligently perform detailed engineering, construction, installation, and operation of a fit-for-purpose plant by the specified target date. This plant can be skid mounted and the Contractor shall assemble, install & commission, operate and maintain at the designated location.

 

The duration of the envisioned pilot is four (4) years. From lab testing and initial pilot design (notional), the figures and only the selected chemical and formulations should be implemented for the pilot (all pilot stages), unless otherwise amended by KOC (refer to ANNEXURE 5).

 

  • The scope of the Services and project brief are further described in Appendix II-A, and shall include but not limited to the following:

 

  • Upfront tasks: conduct and deliver fit-for-purpose: (1) Detailed engineering and design of the Pilot installations and equipment, (2) Integrated monitoring-surveillance plan with monitoring equipment and (3) Pilot Operating Philosophy.

 

  • Deliver the fit-for-purpose water treatment facility including the required units (filtration, etc.), using produced water for the water flooding phase and sea water for the polymer flooding phase.

 

  • Procure and Deliver the selected chemicals (according to their specifications) in the assigned chemical storage warehouse.

 

  • Ensure all operations are carried out as per KOC standards or international industry standards such as API, the International Oil & Gas Producers (IOGP) or equivalent standards.

 

  • Decommissioning of Pilot facilities and site remediation, as required.

 

  • Deliver the fit-for-purpose chemical storage facility at the pilot location.

 

  • Deliver the fit-for-purpose new or used chemical mixing/injection and water treatment facilities, with an operational life of 4 years, in compliance with KOC or international industry standards such as API, the International Oil & Gas Producers (IOGP) or equivalent standards.

 

  • Provide fit-for-purpose lab facilities and adequate online meters and sampling points along the chemical processing to Quality Check all the EOR fluids, on a continuous basis before injection. Quality Controlling the pilot chemicals will be done by the selected contractor, KOC and a qualified third-party.

 

  • The Contractor shall design, perform and interpret results of an Inter Well Tracer Test campaign to evaluate reservoir conformance during the preflush phase as well as oil saturation within the pilot area before and after the polymer drive phase. Subsurface logging and well intervention will be covered by the Company as needed.

 

  • Procure and deliver adequate low shear pumps to minimize polymer degradation and must be capable of injecting up to 2000 bbls/day (500 bbls/day/injector well).

 

  • Provide adequate fluid flow metering (rate, composition) at each injection wells and at the production well (multiphase flow metering).

 

  • Provide an efficient and fit-for-purpose phase (oil, water, gas) separation unit to route the producing well Effluents from the EOR pilot to the assigned facilities defined by KOC.

 

  • The Contractor shall assist in building KOC’s capability with respect to chemical EOR field applications in accordance with KOC’s expectations.

 

  • Stages of the Services

 

      • The Services shall include (but not limited to) the following phases:
      •  
  • Phase 1: This phase is design of the fit-for-purpose surface facilities as per Company’s requirement.

 

  • Phase 2: Prior to the commencement of the chemical flooding, the Contractor shall submit a detailed plan for injection strategy for the UN-LF pilot.

 

  • Deliverables

 

The deliverables by the Contractor for each phase of the Services are described and shall be as further described in Appendix II-A.

  •  
  • Report on system operation capacity:
  •  
  • Report on automation
  •  
  • Report on main equipment components
  •  
  • Surveillance and monitoring plan
  •  
  • List of utility requirements
  •  
  • Polymer flooding implementation

 

    • The Contractor shall provide a Contract coordinator to exclusively work for the Company from the Date for Commencement of the Contract until the expiry of the Contract of Part II and as further detailed in Appendix II-C. All cost associated with the provision of such manpower shall be deemed to be included in the Contract Price.
    •  
  • BIDDER LIST

 

SL No

Company name

1

SHAMDONG DESHI PETROLEUM ENGINEERING GROUP CO. LTD

2

SNF SAS

3

RHODIA OPERATIONS

4

HALLIBURTON OVERSEAS LTD

5

SURTEK INC.

6

BEIJING HENGJU CHEMICAL GROUP CORP

7

SCHLUMBERGER OILFIELD EASTERN LTD

8

SINOPEC INTERNATIONAL PETROLEUM SERVICES CORPORATION

  • NEW PARTICIPANTS

 

  •  
  • Any other bidder who wishes to participate in the tender shall submit their request on or before 22nd July 2019 along with all supporting documents at the address given below:

Team Leader Contract-II, Kuwait Oil Company

P.O. Box 9758, Ahmadi 61008, Kuwait

Tel: (965) 23865557

Fax: (965) 23980639

  • The applicants shall submit the following documents:
  •  
        • Experience of the company in the scope of services.
        •  
        • Provide total number of contracts handled with the intended scope of services of the proposed Tender along with the name of client, duration, scope and value of contracts. (writing Confidential is not acceptable)

 

        • Details of Resources available to handle the Project

 

        • Details of Manpower (Organogram) including organizational structure.

 

        • Employees Qualification and certification of each employee along with details of experience of identical services

 

        • Years of GCC experience along with proof.Note:   
        •  
        •  
  • Submission after the last date specified cannot be considered and will be             rejected.

 

    •  
  • This is a preliminary list. Upon review of the preliminary details, KOC   will      send a detailed list to prospective bidders for submission in detail for      a          detailed analysis. -----------------------

 

  •